Nakheel has floated a tender for a contractor to build marinas at AZure Residences, The Pointe and Club vista Mare in Dubai’s Palm Jumeirah.

The scope of work includes the supply, fabrication and installation of berthing facilities for 12-20m vessels in the three marinas, according to Constructionweekonline news report.

This includes foundations, gangways, access ways, abutments, floating pontoons with anchor systems and all other ancillary services such as water, drainage, power, lighting, fire and safety systems.

Tenders documents can be collected from Nakheel’s offices near Ibn Battuta Mall in Dubai and must be returned by noon on August 22, 2016.
All rights reserved to the initial publisher for emirates247.com
Collected and published by Arms &McGregor International Realty® editorial team. Get in touched with us at [email protected]